Development of a wind farm with up to 32 turbines and associated infrastructure.
The Commission has been asked to provide advice on whether an amendment to the Waverley Local Environmental Plan 2012 should be made to list 34 Flood Street, Bondi as an item of local heritage.
Construction and operation of a 34 storey mixed use building comprising of 204 build to rent units, 3 storey retail and commercial podium, excavation for 3 levels of basement car parking for 84 car spaces, rooftop terrace and communal open spaces.
A modification to increase the residual transfer between the pre-treatment section of the Springvale Water Treatment Plant to the Western Coal Services tailings emplacement area.
A modification to increase the residual transfer between the pre-treatment section of the Springvale Water Treatment Plant to the Western Coal Services tailings emplacement area.
A modification application for an existing water treatment plant to extend the timeframe of an interim water management strategy.
A modification application for an approved open-air cargo storage facility to permit operations on remediated land.
An integrated health services facility development application for a new hospital, seniors housing and respite care facility, including an 11 storey building.
A renewable energy development application for a 384MW wind farm comprising 64 wind turbines, a 100MW battery energy storage facility and a 330kV transmission line.