A development application for the continuation of open cut mining operations at the Maules Creek Coal Mine for a further 10 years (from 2035 to 2044), with production of up to 14 million tonnes of run-of-mine coal per annum.
A development application for the construction and operation of a wind farm with up to 76 wind turbines, battery storage and associated infrastructure.
A development application for the construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.
Concept Plan and Stage 1 detailed works (southern portion) for the use and operation of a cemetery, including burial plots, crematorium, chapel, vaults and crypts, general site layout and associated landscaping, roads, footpaths, administration and caretaker/storage buildings.
A modification application to an approved commercial building at the Port of Newcastle, to increase the building's height and the area of the plant room, reduce carparking by 2 spaces to allow the inclusion of a generator and substation and for minor building facade changes.
Review of a Gateway Determination for a Planning Proposal to amend the Tweed Local Environmental Plan 2014 to replace minimum lot size and historic dwelling entitlement provisions for land in Zone RU2 with a merit-based approach, and enable more flexible boundary realignments within Zone RU1 and Zone RU2 .
A State significant infrastructure application to increase the length of the quayline at Brotherson Dock (southern side), including construction of 5.3ha of additional wharf area, dredging to provide material for the extended quayline and wharf, demolition of an existing bulk liquids berth (BLB) and construction of a new BLB.
A modification application for the approved Port Botany Expansion to make operational and administrative amendments
A development application for construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.